← Field manualEstablishment & renovation

Installing drainage before topsoil

Put drainage in before the topsoil goes back. Retrofitting it under an established lawn means tearing the lawn up again.

Plate 3 — Install drainage before topsoilLoops · silent
When
In order, while the lawn is being made
For
Any lawn
Rule
est-groundwork-drainage · Hessayon; RHS; Regional
Put drainage in before topsoil goes back — retro-fitting it under an established lawn means tearing the lawn up again.

Do you need it?

Dig a hole about 30 cm (1 ft) deep, fill it with water, let it drain, then fill it again and time it. If the second filling takes more than a day to drain, or the ground stays squelchy for days after rain, grass roots will sit in water and the lawn will be thin, mossy and prone to disease.

The options

  • Improve the soil: on mildly heavy ground, breaking up compaction and working in coarse sand and organic matter is often enough.
  • A French drain: a gravel-filled trench with a perforated pipe that carries water to a lower point, a soakaway or a legal outfall.
  • A herringbone system: several branch drains feeding a main drain, for large, persistently wet areas.

Drains need somewhere to discharge. Check local rules before connecting to any sewer or watercourse.

Why now

Trenching is easy on bare ground and destructive on a finished lawn. Lay drains after the coarse grading and before the topsoil goes on, and keep a record of where the pipes run.

Next: terrace any slope steep enough to wash out, then clear and cultivate the ground.

Sources

  • D.G. Hessayon — The Lawn Experthessayon
  • Royal Horticultural Society — lawn guidancerhs
  • Regional practice — continental climate, zone 7regional