Leveling and regrading the surface

Shape the ground first. Every dip that ponds water and every bump the mower scalps comes from skipping this step.

Plate 4 — Level and regrade the surfaceLoops · silent
When
In order, while the lawn is being made
For
Any lawn
Rule
est-groundwork-grading · Hessayon; RHS; Regional
Coarse regrade to a gentle, even fall first — no dips that pond water, no bumps the mower will scalp.

What you are aiming for

A lawn does not need to be dead flat, but it does need an even surface with a gentle fall so rain runs off instead of sitting in hollows. Around buildings the ground should slope away from the walls. A fall of roughly 1–2 cm per meter (about ⅛–¼ in per foot) is enough to shed water without being noticeable.

How to do it

  1. Mark the high and low spots. A long straight board with a spirit level on top, or string lines between pegs, shows them quickly.
  2. Move soil from the high spots into the low ones with a shovel and a landscape rake. On large plots a small loader or a hired operator saves days.
  3. Keep the topsoil separate if you can: strip it, regrade the subsoil, then put the topsoil back as an even layer.
  4. Let rain or a thorough watering settle the ground, then fill the hollows that appear.

Why it comes first

Coarse grading moves a lot of soil. Doing it after drainage, topsoil or seed means undoing that work. Fine leveling with a rake comes later, just before sowing, and is a separate job.

Next: install drainage where the ground stays wet, and terrace steep slopes.